WADI ALNATROUN PRISON COMPLEX – BIHERA – EGYPT
MINISTRY OF INTERIOR
MINISTRY OF INTERIOR
Scope: Construction of 4 prison buildings including concrete works and electricity.
Main contractor: Concrete Plus
Consultant: ECG
Date of award: 2016
PROJECT OVERVIEW
Wadi Alnatroun Prison Complex is a governmental development located in Bihera, executed to support essential public infrastructure. The project includes the construction of four prison buildings, covering core concrete works and electrical installations to meet strict operational and safety standards.
The execution focused on structural reliability, compliance with technical requirements, and efficient delivery to ensure the facility is fully prepared for long-term operation and future functional needs.
SCOPE OF WORK
The project scope included the construction of 80 residential villas delivered on a complete turn-key basis. The works covered all structural, architectural, and infrastructure components, ensuring full readiness for handover.
- Construction of 4 prison buildings with full structural concrete works
- Execution of electrical works and key service infrastructure
- Coordination with the main contractor to ensure smooth site workflow
- Delivering buildings ready for operational handover according to standards
Main Contractor: Concrete Plus
Consultant: IDG
DESIGN & EXECUTION APPROACH
The execution approach focused on delivering high-quality residential units through precise planning, efficient construction methods, and strict quality control. All phases of the project were carefully coordinated to ensure consistency across the development.
Attention was given to:
- Strict compliance with technical and security requirements
- Structural accuracy and continuous quality control across all phases
- Timely execution while maintaining design integrity and site safety
- Efficient coordination between civil and electrical work packages
This approach ensured the successful delivery of the project as a fully integrated residential community aligned with modern urban development requirements.
PROJECT IMPACT
This integrated approach ensured the successful delivery of the Wadi Alnatroun Prison Complex with reliable structural performance and compliant electrical execution, supporting long-term operational readiness and sustainability.